The pit waits for the surveyor.
Fault repairs and house connections are faster than the survey.
Source: practice in network construction
Your fitters survey house connections, joints and routes to the centimetre in position and depth – with photos, right while they work, without waiting for the surveyor.

¹ Centimetre-accurate with RTK fix (typically 1–3 cm). Accuracy depends on the correction service and reception – see the questions below.
By 2045, Germany will need more than 500,000 km of cable and around 500,000 transformers. Large cities had to submit their heat plans by June 2026, smaller municipalities have until mid-2028.
Sources: BDEW / ZVEI; BDEW
Fault repairs and house connections are faster than the survey.
Source: practice in network construction
The GIS department retypes and asks questions.
Source: practice in network documentation
Total cost of utility damage: on average around 29 times the repair cost.
Source: BIL eG
Create the object catalogue and layers once per network area; load the work order or GIS extract into the project.
Measure position and depth with RTK and laser or with the camera (AR), choose the object type, take photos – offline too.
Check measurement quality and completeness in the cloud, export to the GIS; subcontractors also deliver the measurement to the BoQ.
StandardFrom PremiumEnterprise
Utility: power, gas, water, heat
StandardUtility: all
StandardUtility: power
From PremiumUtility: heat
From PremiumUtility: municipal utilities
From PremiumUtility: all
EnterpriseUtility: power
StandardUtility: all
StandardPoints, lines, areas, control points, terrain model, volumes to REB, baseline with dimensions. Triple-band GNSS with RTK, laser for height, tilt compensation up to 45°.
Capture a pipe or cable with the camera, several lines in one shot, a pile or pit as a volume with a 3D point cloud; georeferencing via reference points.

Survey property connections and inspection chambers, manhole and invert levels by laser, map hydrants and valves. Where private responsibility begins is set by the local drainage bylaw – exactly these transfer points are documented.
Source: LfU Bayern
Stake out mast positions and foundation corners, record working areas, foundation excavation as a volume (from Premium), survey underground cable sections, document reinstatement.
In Germany, VDE-AR-N 4201 and DVGW GW 120 govern network plans for power and pipe networks in the same way. 3tag delivers position, depth, dimensions and sketch sheets to your drawing standards.
Source: VDE FNN
Instead of estimating from a photo – with fix status and check measurement in the report.
Staking out, surveying and measurement in one device.
All crews and subcontractors deliver the same data – through templates and component lists.
Roles per network area, mandatory two-factor authentication, cloud in Germany.
after 12 months €99/month
software included for 24 months
Framework agreement for organisations
From Standard to Premium within 12 months for €3,500.
Your question isn’t here? Get in touch – we answer personally: +49 30 692098611 or hello@3tag.ai.
No. They remain in charge of large routes; 3tag covers the many small pits.
3tag measures position by RTK, the integrated laser transfers the height – even in deep pits. With an RTK fix the result is centimetre-accurate; accuracy depends on the correction service and reception. Fix status and check measurements appear in the report.
Shape, GeoPackage, DXF and DWG as well as import and export for Smallworld. You create the object catalogue, layers and component lists (e.g. via CSV) once per network area. DXF block templates per client are possible; custom export formats are part of Enterprise.
You give subcontractors permissions for individual projects. There they work with your project templates and component lists and deliver the same data as your own crews – plus the measurement to the BoQ if required.
The cloud runs on servers in Upper Franconia, Germany, GDPR-compliant with DPA and TOMs. For IT approval there is mandatory two-factor authentication for the whole organisation, roles per network area, a list of all open-source licences and account deletion under GDPR.
Usually with a pilot: 3–5 devices, 8 weeks of everyday use. We set up templates, component lists and your export format. Then you decide on a framework agreement; we supply the DPA and TOMs for IT approval.
We will get back to you within one working day and suggest dates.