Cable routes must be surveyed before backfilling.
If you wait for the surveyor, the crew stands still.
Source: practice in PV construction
Survey cable routes, stake out stations and areas, prove quantities – on the same day the work is done.

¹ Centimetre-accurate with RTK fix (typically 1–3 cm). Accuracy depends on the correction service and reception – see the questions below.
In 2025, almost half of Germany’s new solar capacity was ground-mounted. Onshore wind permits totalled almost 20.8 GW. A sharp rise in new wind capacity is expected from the end of 2026. Installation companies are looking for partners to stake out foundation points and survey cable routes.
Sources: Bundesnetzagentur; VDI nachrichten; auftragsbank
If you wait for the surveyor, the crew stands still.
Source: practice in PV construction
Row ends, spacings, fence line – every check needs an appointment.
Source: practice in PV construction
One sample site plan specifies a foundation 25.5 m in diameter and a crane pad of 1,059 m².
Source: Uetze wind farm: crane pad plan
Georeference the layout, route or crane pad plan (DWG / DXF), import the bill of quantities.
Stake out fence, row ends, stations and crane pad; survey DC/AC routes and joints; record foundation pits.
As-built plan for operator and network operator, volumes and quantities for billing, photo documentation for acceptance.
StandardFrom Premium
PV / wind: both
StandardPV / wind: PV
StandardPV / wind: PV
StandardPV / wind: wind
From PremiumPV / wind: wind
From PremiumPV / wind: both
From PremiumPV / wind: both
StandardPoints, lines, areas, control points, terrain model, volumes to REB, baseline with dimensions. Triple-band GNSS with RTK, laser for height, tilt compensation up to 45°.
Capture a pipe or cable with the camera, several lines in one shot, a pile or pit as a volume with a 3D point cloud; georeferencing via reference points.

Series stake-out of thousands of ram posts in a park is still done by the GPS-controlled pile driver. 3tag is the tool for everything else: cable routes, stations, fence, crane pads, quantities – and spot checks on the posts.
For staking out, surveying and volumes.
Offline maps and Galileo HAS without mobile data (from Premium).
For operator and network operator straight from the measurements.
For long days in the park. Connects via Bluetooth and USB-C.
after 12 months €99/month
software included for 24 months
Framework agreement for organisations
From Standard to Premium within 12 months for €3,500.
Your question isn’t here? Get in touch – we answer personally: +49 30 692098611 or hello@3tag.ai.
The surveyor comes on fixed dates, but cable trenches are backfilled every day. 3tag measures in between.
Open fields give GNSS good conditions: with an RTK fix you measure to the centimetre; accuracy depends on the correction service and reception. Where there is no mobile coverage, 3tag receives correction data via Galileo HAS from Premium – the accuracy traffic light shows the quality achieved before every point.
Yes. After video training, installers stake out and survey themselves; the stake-out layer, stake-out radar and accuracy traffic light guide them through every point. From Premium there is also a two-hour live onboarding.
DXF is included in Standard; from Premium you also get DWG, Shape and GeoPackage as well as REB DA11 and GAEB X31 for billing. You create the as-built plan straight from the measurements.
We don’t publish standard rental prices on the website. Get in touch – we’ll make you an offer based on project duration and number of devices.
We will get back to you within one working day and suggest dates.