Duty of care without complete evidence.
Municipalities must inspect and document certain trees regularly. Often the exact position or the photo is missing.
Source: Forum Verlag
One device for the depot, parks and civil engineering departments: capture municipal assets to the centimetre, prove inspections and transfer the data straight into the GIS.

¹ Centimetre-accurate with RTK fix (typically 1–3 cm). Accuracy depends on the correction service and reception – see the questions below.
German municipalities want to use funds from the special infrastructure fund mainly for roads (50 %) and schools (48 %). More projects mean more street works, acceptances and as-built data – with the same staff. Sponge-city concepts add new tree locations, swales and soakaways.
Sources: KfW Research Fokus No. 550; German Federal Government
Municipalities must inspect and document certain trees regularly. Often the exact position or the photo is missing.
Source: Forum Verlag
Street works by utility companies carry great potential for conflict. The road authority can check reinstatement until the end of the warranty – but only with evidence from the day of acceptance.
Source: TRID; Service Bremen
Lamps, signs, play equipment and manhole covers are only roughly located.
Source: practice in municipal GIS offices
Load layers from the municipal GIS (tree register, roads, list of street works), create inspection attributes.
Walk the assets, set point, condition and photo – offline too.
Data back into the GIS, inspection reports and acceptance records as PDF.
StandardFrom Premium
Points, lines, areas, control points, terrain model, volumes to REB, baseline with dimensions. Triple-band GNSS with RTK, laser for height, tilt compensation up to 45°.
Capture a pipe or cable with the camera, several lines in one shot, a pile or pit as a volume with a 3D point cloud; georeferencing via reference points.

Service specification, fixed prices with an enquiry form, data protection with DPA and TOMs, and a checklist on server location and IT approval. Note: whether a direct award is possible depends on the thresholds of your federal state.
Your tree register software stays – 3tag delivers the data for it.
Depot, parks and civil engineering departments work with the same maps.
The depot captures, the GIS office checks.
Easy to budget – package prices are published on the website.
Servers in Upper Franconia, GDPR, DPA and TOMs, permissions per project.
after 12 months 99 €/month
software included for 24 months
Framework agreement for organisations
From Standard to Premium within 12 months for 3.500 €.
Your question isn’t here? Get in touch – we answer personally: +49 30 692098611 or hello@3tag.ai.
No. After a short introduction the depot captures data itself; the GIS office checks it in the cloud.
Yes. Your tree register software stays. 3tag loads layers from your GIS and returns points, photos and conditions – as PDF report and CSV, from Premium also as Shape or GeoPackage for QGIS and ArcGIS.
No. Tree inspection to FLL guidelines is still carried out by your qualified specialist. 3tag documents it: location, photo, condition and date for each tree.
GNSS needs a clear view of the sky. Under dense canopies accuracy can drop – that applies to every satellite-based system. The accuracy traffic light shows the quality before every point; uncertain points are flagged in the cloud; check measurements and point averaging add extra certainty.
For official surveys and cadastral surveying: yes. The many small everyday captures – tree locations, street works, damage, play equipment – are done by the depot and departments themselves with 3tag, without waiting for an appointment.
On servers in Upper Franconia, Germany – GDPR-compliant, with DPA and TOMs. Only the people you grant permissions for a project have access; two-factor authentication is mandatory for the whole organisation.
We will get back to you within one working day and suggest dates.